Warehouse & Industrial
7/8
Johnson Controls Inc.
Riverside, Missouri
Contractor:
Crossland Construction Company, Inc.
Structural engineering analysis, design and detailing of 170,000 SF single story manufacturing facility. Design of building included structural steel roof framing, floor framing for a 7,000 SF service mezzanine, coordination with precast concrete wall design and concrete foundations. The design timeframe was limited to 2 weeks and the design and construction period was set and met at 90 days due to owner and end user requirements.